cancel
Showing results for 
Search instead for 
Did you mean: 

process chain transport question

Former Member
0 Kudos

Hi, experts,

out regular process is made change in Development system, then transport to Quality and Production system.

But I alway meet problem in transport Process chain. normally it can transport ot Quality system successfully. but error alway happened within transport to Production system. "Object XXXX has not been imported successfully"

anyone can help me out? thanks a lot

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Ho Jie,

Do you have any user-defined event in your process chain which has not been created in Production system.

Also check if all the infopackages,Data targets,etc.. in Quality and Production are same or not.

Bye

Dinesh

Former Member
0 Kudos

no, actually this's just tiny change in process chain.

these is some message for failed import:

R3TRRSPVDBSTAT original object cannot be replaced

Message no. TW103

Diagnosis

An attempt was made to overwrite an original object with an import.

System response

The object is not imported.

Procedure

If you still want to import the object, repeat the import with Unconditional Mode 2.

then I delete Process chain in production system and re-transport it. the error in import said:

R3TRAPCO0ACN was repaired in this system

Message no. TW104

Diagnosis

Object R3TRAPCO0ACN is in repair status. Therefore, it cannot be imported.

System response

The object is not imported.

Procedure

If you still want to import the object, release the relevant repair and repeat the import.

Former Member
0 Kudos

Hi Jie,

The log gives the clear pciture of the problem. I guess, you have done some changes to the Process chain in Target System(QA/Prod whereever ur tranport is failing) directly. After that you are trying to move some changes from Dev. The import of this transport request should be donw with <b><i>'Overwrite Originals'</i></b> option during the import step. Else the import will fail!

Try doing import with that option checked.

Regards,

Sree

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi Jie/Sree,

Not just Overwite Originals but also the <b><i>Overwrite in Unconfirmed repairs</i></b> also. Thats what I meant by both the options.

Bye

Dinesh.

Message was edited by: Dinesh Lalchand

Former Member
0 Kudos

Hi Jie,

You can do a retransport of the request. Select both the options for "Overwrite objects". Hopefully the request should move to Production.

PS: For your Info, from the log it is clear that the problem was in one of the Process Variants and also Application Component.

Bye

Dinesh.

Message was edited by: Dinesh Lalchand

Former Member
0 Kudos

yes, the log is showed lot of object with error message

"Object XXXX has not been imported successfully"

but it's successful in quality system

Former Member
0 Kudos

hi,

there could be some differences between prod and qa systems.

Could you paste those error messages?

Regards,

Andrzej

Former Member
0 Kudos

Hi Jie,

When you double-click on that error mesg, it will open up a detailed transport log which will give you more information abt that problem. Check that.

Regards,

Sree

Former Member
0 Kudos

hi,

could you go to transport logs and check more detailed error messages there?

Regards,

Andrzej