Using KP06: how do I replace the first excel upload with a revised version?

Former Member
0 Kudos

This our first year to use KP06 with actuals.  So I need to replace this existing numbers with a new projection for Sept-Dec 2012.

How can I copy over the first entry that has been saved.  I have the data in excel ready to load.

Thanks

Tonya

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Tonya,

As Ajay Said,

Upload excel with new value.It will replace the Old data in KP06.

regards

Raman Rana

Answers (1)

Answers (1)

ajaycwa1981
Active Contributor
0 Kudos

Hi Tonya

Upload the data for those periods again and it will replace the existing values

Ensure that your new file contains all the records as in last file so that they wil be over written

br, Ajay M

Former Member
0 Kudos

If I clear the contents and copy the the data in to SAP, the original entry pops back in at the top of the spreadsheet??

ajaycwa1981
Active Contributor
0 Kudos

Hi

Suppose you uploaded 600 earlier against a cost center / cost element... and you want it to be 700 now

Simply upload 700 against same CC/CE and it wil replce 600

br, Ajay M