Controlling Area change for a Company Code

former_member31620
Active Contributor
0 Kudos

Hi

We have a requirement to change the Controlling Area for a Company Code (OX19), and there are Cost Centers exists with these Controlling Area and company code mapping (KS03)

How do we deal with this requirement? How can I change the Controlling Area of existing Cost Centers? How can I change the Controlling Area for a Company code? What is the impact that we have with this change? Any help on this would be greatly appreciated.

Thanks

Reddy

Accepted Solutions (1)

Accepted Solutions (1)

former_member318765
Contributor
0 Kudos

Hi Reddy,

If transaction data exists there is no possibility for a customer to change the controlling area/company code assignment. All CO relevant postings depend on this assignment.

Please have a look at the online documentation regarding the subject:

Maintaining a Controlling Area:
The deciding factor for setting basic data is the organization of cost accounting, meaning the assignment of company codes to a controlling area. This decision is irreversable as soon as master data is created.'

'The way company code and controlling area are assigned affects the currency settings, meaning currency type, currency, and currency updating, in addition to the controlling area chart of accounts and the fiscal year variant.'

Also review the note 34879

It states:

"A controlling area can be deleted if it no longer contains master data, transaction data and other dependent data (such as groups, number ranges)."

Hope this helps.

Kind Regards

Soumya

former_member31620
Active Contributor
0 Kudos

Hi Soumya

Thanks a lot for your response on this.

Master Data I could find from CSKS table. How do i find whether Transactional Data exists for a specific Controlling Area?

Any help on this would be greated appreciated.

Thanks

Reddy    

former_member318765
Contributor
0 Kudos

Hi Reddy,

Do you have any transactions done with this current setup? If yes then there is no possibility to change the controlling area/company code assignment. Hope this clarifies.

Kind Regards

Soumya

former_member31620
Active Contributor
0 Kudos

Hi Soumya

Thanks again for your response.

I had a look at the Cost Centers associated with this controlling area, and have identified the employees associated with these cost centers.

None of the employees have Payroll run which means there is NO posting happened. This is what I have checked as part of impact analysis. And have also prepared a plan to update the existing Employee Master Data Records to replace old cost centers with new cost centers (with new controlling area).

I think we are good to perform below steps:

1. Delete the cost centers through KS04 to clear CSKS table with old Controlling Area

2. Delete Co. Code and Controlling Area mapping through T code OX19

3. In table V_001_B - Change Chart of Accounts of the Company Code(Old and New Controlling Areas have different cost centers)

4. Assign Co.Code to new Controlling Area through OX19 T code

5. Create Cost Centers with New Controlling Area through T code KS01.

6. Correct Position and Cost Center relationships (T code PO13, A011 Relationship between S - Position & K - Cost Center)

7. Run program RHINTE30 to update Employee's Master Data (Update Infotype 0001).

Hope this plan is fine. Do you see any other problems? If yes, can you please provide your inputs.

Thanks

Reddy

former_member318765
Contributor
0 Kudos

Hi Reddy,

Once the system is live with this setup it is not advisable to change the same without complete checking as it can lead to inconsistencies. I found the below SCN thread which has some information. Please check

http://forums.sdn.sap.com/message.jspa?messageID=9839298

As mentioned there, To avoid inconsistencies in this case, the best would be to contact the department "System Landscape Optimization (SLO)" , which provides special consulting services for similar enquiries: http://service.sap.com/slo for further information

Kind Regards

Soumya

narasimhulu_konnipati
Active Contributor
0 Kudos

Hi Reddy,

I totally agree with Soumya and it leads to significant inconsistencies. Please take the help from SLO as suggested by Soumya above.

Thanks

former_member182098
Active Contributor
0 Kudos

Is there any business logic for changing the controlling area?

First of all system would not allow you to change this if it contains master / transactional data. It is not clear you at what state in your Production system. If you are already go live, please not to take any risk. Please contact SAP SLO team with your requirements. Be careful, some of the programs will totally wipe out the data and it will create a big mess in the system.

Regards,

Ravi

Answers (2)

Answers (2)

former_member424251
Participant
0 Kudos

Please check the below link. You may find it useful.

http://scn.sap.com/thread/3219540

Regards,

Reshma

Former Member
0 Kudos

Hi

Please read the following help document and thread:

http://help.sap.com/saphelp_45b/helpdata/en/4f/154b6e5733d1118b3f0060b03ca329/frameset.htm

http://scn.sap.com/thread/1272573

Thanks & Regards,

Umamageshwaran. s