Skip to Content
0
Former Member
Jul 12, 2005 at 01:41 PM

Process chains

19 Views

HI,

i scheduled a process chain that i created and the load is not complete yet, how wud i know if there are errors i am sure there r errors coz the same load takes 7 mins in a diff system. and this one takes forever (more than 24 hours)

how do i stop the process?

actually i created a info package and created a process chain n scheduled the load in teh proces chain. I didnt check if the info package really works so i need to stop the process chain go back and load data into info package and see if i get errors.

And why is that when i load data it shows 0 from 0 records??? i get this message in process chains and also in other loads that i do using infopackage. what am i doing wrong?

why do i get a message no data available?

This is the error message i get in process chains

No data available

Diagnosis

The data request was a full update.

In this case, the corresponding table in the source system does not

contain any data.

System response

Info IDoc received with status 8.

Procedure

Check the data basis in the source system.

Thanx