Skip to Content
0
Former Member
Sep 05, 2012 at 12:58 AM

Tracking Material by Internal order

96 Views

HI Techies,

I have a requirement to track a some materials for revenue and expenditure, which I think can be done through non settling Internal order.

Is there a way to configure the material master so that the user dont have to put the internal order every time he do a PO. and at the time of billing.

Or is there a report in MM which can help track the inc and exp of a particular material which is in a presentable format.

Regards

Rahul