Hi Gurus,
I have a problem with a material.When the backflush take place that material is done for the storage location 2001 when in MM03 the storage locations for that materials are 0001, 0010( check the pictures of the COGI and MM03).
Have someone faced this issue?.
If someone could help me i would really appreciate!!.
Thanks and regards,
Franck.
Follow the flow below:
1. Go to production order >> component over view and see what storage location is mentioned.
2 (a). MM03 >> MRP 2 tab >> Production Storage location ( system will allow un-extended storage locations, with a warning message)
2 (b). Go to BOM >> Component details >> Status/Long Txt. tab and see what production storage location is maintained. (system will allow un-extended storage locations, with a warning message)
Error Message: M7 006 = Material & & & does not exist
Solution:
Part a: In COGI, change the storage location to 0001 or 0010 and post the material document (press save in cogi)
Part b: So, change the issue storage location either in BOM or/and Material Master to storage location 0001 or 0010.
Part c: Go to all the production orders which have been in WIP and change the storage location manually in component overview. (For orders which are just release and no production has started you can do RE-READ pp master data, not required if you're just manually changing)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
7 | |
7 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.