Message no CK468- Error while running cost of material define for sub-contracting

367 Views

While running cost of the HALB material defined for sub-contracting through T.Code CK11N we are facing error details of which are given hereunder and screen shot of which are attached herewith:

Message no CK468: No Price could be determined for subcontracting.

The system could not calculate a price for subcontracting because none of the valuation strategies in valuation variant 001 was successful.

Please note that this error is comming after we have defined all the 3 valuation strategies option available.

Kindly guide us to resolve above error and if possible please send the overall process to be carried out for immplementing the costing with reference to material defined for subcontracting category.