cancel
Showing results for 
Search instead for 
Did you mean: 

Alternate base value for cess condition type

Former Member
0 Kudos

Hi All, Specific requirement: JMIP and JMOP condition type are maintained in FV11 for the condition table material+plant+vendor.

and at the time of GR everything is working fine:

JMIP is calculated on base value.

JMOP is calculated on Base value + JMIP value = BED in mIGO

my requirement is CESS and HSCESS should also be calculated on the BED+JMIP value for a specific vendor. 

To adress this I wish to use alternate base value field in front of cess condition type. but this should work only for specific vendor??

Just wondering can this work ??

Accepted Solutions (1)

Accepted Solutions (1)

brinda_r
Active Contributor
0 Kudos

Hi Rahul,

You can create a new Z condition as part of your tax procedure to hold value BED + JMIP and develop a routine to restrict it for a sprcific vendor and assign it to Z condition and on that Z condition calculate your ECS and SECESS.

Regards,

Brinda

Answers (0)