Hi

are there some reports to see the revison and what changes have been made in this revision?Currently,I can only see the revision in MM03 , then get the change number and check the changes in the change number...Any other better ways?thanks..

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Best Answer
    Posted on Aug 20, 2012 at 07:58 PM

    I'm not sure of any report which has revision level on the selection field including the dynamic selections in Change Management Information System (CC07),

    Go to table AEOI and in the field REVLV enter the revision level and execute, it will give all the change numbers it's been used with. Field OBJKT normally stores the material number.

    There are other related reports available through area menu SAP1

    And through Area Menu CC00


    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 22, 2012 at 06:31 AM

    Hi,

    By transaction CC13 you can see the revision history of the material.

    Regards.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 20, 2012 at 04:57 PM

    Hi

    Change log can be checked with tables CDPOS and CDHDR.

    T Code : AUT10 to track changes in a particular T Code.

    Regards

    Vikas

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 21, 2012 at 04:16 PM

    Hello,

    I am not so sure as what you mean about the revision thing but you can try transaction code MM04.

    It displays MMR changes and is a std report of SAP.

    Hope this helps.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 22, 2012 at 01:10 AM

    Hi

    Check at the table level CDPOS, CDHDR to get details.

    Also check CC07 if you are using change management and other tcodes of change history.

    Best regards,

    Sharat

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.