cancel
Showing results for 
Search instead for 
Did you mean: 

pooled samples

Former Member
0 Kudos

Hi There,

We are doing inspection with physical samples.

Sample Drawing Procedure is defined: Samples are drawn based on the number of containers in which the batch is deliverd. (p2). A formula is set.

The system then pools the samples from above and partial samples formed, (to be destibuted to various labs) which is shown as " Partial samples to be formed" on the sample drawing instruction.

I want to hide this "Partial samples to be formed" part of the sampling instruction from the sampling instruction. Is it possible without getting into scripts ?

Regards

SG

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

No..its not possible to avoid this unless you make changes in the script itself.

Reason its appearing is its distributing sample as per "partial sample number" assigned @ char level of the Inspection plan.If you do not mention anything there ,by default system picks first item od SDP.

Answers (0)