Skip to Content

STMS Configuration ABAP Systems

Hi experts,

I am new to STMS.

We have three systems:

SOL(100) - Dev

SOL(200) - QAS

SOL(300) - PROD

All of these ABAP systems are in solution manager but with different clients. What are the steps needed in order to setup the transport route for these systems in STMS? Should I create a virtual system in STMS? Any help would be great. Thanks a lot!

Luigi

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Best Answer
    Posted on Aug 14, 2012 at 05:19 PM
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 15, 2012 at 04:48 AM

    This is possible to do .

    You go into STMS , then go to transport routes , change to edit mode .

    Then Edit --> Transport Target group -->Create

    Give a Name such as /ZSOL/ , provide a description , Add system as SOL and client assignment as 200. Drag the transport target into the window.

    Once done , then Edit --> Transport route --> create .

    Drag the stylus from /ZSOL/ to PE1 , add consolidation route as ZSOL .

    Repeat the above and add consolidation route as SAP.

    Now again drag the stylus from PE1 to PE1 again . This time add delivery route . Source client as 200 and target client as 300.

    Ensure that clients 200 and 300 are closed and do not allow changes in them .

    Once you release in 100, it would be ready for import into 200. Import into 200 , it will be ready for import into 300.

    Hope this helps.

    Regards

    Ratnajit

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 15, 2012 at 07:44 AM

    hi Luigi Co,

    Please find below link in which STMS configuration is explained with screenshot.

    STMS Configuration

    Regards,

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 20, 2012 at 06:04 PM

    hi.

    SOL(100) SOL(200) and SOL(300) are single system with 3 clients or different systems.

    if all are different system.

    select one which you want as domain controller.

    let it be SOL (100)

    login in client 000 for SOL (100) system.

    go to STMS.

    as soon as you go to STMS for 1st time a screen is popup and ask you to create STMS and select the domain controller.

    then add the stallite system and then logon into the client you want to configure (SOL (300) and SOL (200))

    there will be popup to approve in STMS approve it.

    for transport route ( DEV->QA>PRO) dev to quality there are 2 routes, one conslidation and other delivery route from QA to PROD only one route that is delivery route

    for better understanding go throught the link

    http://help.sap.com/saphelp_nw70/helpdata/en/44/b4a09a7acc11d1899e0000e829fbbd/frameset.htm

    regards,

    Meenakshi

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.