Initial Settings in SAP PI 7.3 after System Installation

Hi,

We are installing SAP PI 7.3 here. After media installation by BASIS team, what all other things an SAP PI consultant should maintain/configure(initially before start working on scenarios) ?

Since I have worked on SAP PI scenarios where the SAP PI server was completely ready(set up). This is the 1st time I'm working on completely new SAP PI system.

So please guide me at the earliest.

Thanks,

Amit Patil

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

5 Answers

  • avatar image
    Former Member
    Aug 13, 2012 at 09:22 AM

    Hi All,

    Any update on this? I really need help on this.

    Thanks,

    Amit Patil

    Add comment
    10|10000 characters needed characters exceeded

    • Hi,

               You first need to setup the SLD - product, technical systems, business systems, software components.

      Also, you need to establish the RFC destinations in the SAP systems for Idoc\RFC\proxy connectivity.

      Regards

  • Aug 13, 2012 at 09:43 AM

    Hi Amit,

    Check this thread http://scn.sap.com/thread/2136162

    I haven't noticed nothing new since that thread.

    Regards.

    Add comment
    10|10000 characters needed characters exceeded

  • Aug 13, 2012 at 09:58 AM

    Hi Amit,

    For post installation steps, you can refer to SAP Library - Configuring Process Integration (PI) After Installation.For Readiness check use the readiness check document(ReadinessCheckFor73.pdf) available in sap note 817920. Although, most of the above activities fall into Basis area, i usually ensure that the system is ready for development use by going through these steps.You can then start work on getting your SLD objects created.

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi All,

      Out of these settings/configurations, what all things will be done by Basis Guys? and what all things I need to do as a SAP PI consultant?

      I have worked on directly fully functional SAP PI system, I'm not aware of all these pre-processings, so please guide me in this at ground level.

      Thanks,

      Amit Patil

  • Aug 14, 2012 at 09:35 AM

    Hello

    There are 3 main areas when doing an install:

    1. Server preparation and system installation - Basis
    2. Apply the latest Support Packs and Patches - Basis
    3. Run the post install Configuration wizards - Basis and/or PI Consultant (see note #1309239 Configuration Wizard: PI NetWeaver initial setup)

    Regards

    Mark

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Aug 16, 2012 at 04:24 AM
    Add comment
    10|10000 characters needed characters exceeded

    • Hi Amit,

      It is not really clear what you are requesting.

      If the system is installed and the post install configuration wizards are successfully completed, then your system is ready to develop scenarios in the ESR and ID. You have already been referenced note #817920 which walks you through the basic checks to insure the PI system is correctly configured. Have you completed these checks?

      If you want to know how to configure specific scenarios e.g. how to set up a proxy Business System, then you need to clearly state your requirements.

      I recommend that you close this thread and open a new one which clearly outlines what you want to do.

      Regards

      Mark