Hi Gurus,

I was confronted with a problem. I have a MTS production. In this particular case I am using a single-level BOM and I want that one of the components (Raw Material) to be consumed from 2 different lots according to a predefined proportion:

  • 65% from lot A
  • 35% form lot B

During the confirmation stage, the component must be displayed according with the percentages and all that the user has to do is to assign the lots that are meant to be consumed.

Any help in this matter would be much appreciated.

Thanks in advance.