Skip to Content
0
Former Member
Aug 08, 2012 at 08:55 AM

product allocation problem

69 Views

these are the steps i followed for using the standard info structure s140

1.Create Info structure mc21
2. Maintain update rules mc24
3. Activate updates 0m01
4. Assign update group both item and header
5. maintain product allocation procedure
6. maintain allocation object
7. maintain allocating hierarchy mapping ????
8. define consumption periods
9. control product allocation
10. activate allocation for requirement class
11. activate allocation for schedule line category
12. maintain planning parameters for info structure mc7f
13. define planing type mc8a
14. create planning hierarchy mc61
15. maintain plan in flexible planning mc93
16. material master has been assigned to prod alloc procedure

but the result always is like the image attached the (product allocation) in the GO TO menu is always inactive

Message was edited by: Mahmoud AbdelWahed what should i do to activate the "product allocation" in the GO to menu\

Attachments

pastedImage_3.png (96.0 kB)