SAP jobs : How can we job a periodically scheduled job at a future time ?

Hi.

I have checked this but i have not be able to stop a job which is running periodically at a future time.

Suppose say, a jobA is running at a interval of say 1 hr.

And if i want to stop jobA at at a future time say beyond midnight today, and i do not want to run this job thereafter.

How can i do this, without a manual intervention.

I can stop the job - by selecting the job at any particular time in SM37 and change the status to scheduled. So that it does not run thereafter.

But how to automate this on the system itself.

Can anyone advise.

Or this has to be done thro a BDC only 😔

Thanks

indu

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Aug 03, 2012 at 09:37 AM

    Hi Indumathy,

    Hope i understand your query clearly,

    There is no option avail in SAP default from this. You may contact your ABAP and try to implement a new tool to stop the job automatically.

    Hope this helps. Let me know if you have queries

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Indumathy,

      For your requirement, It is not applicable without manual intervention, instead of you can take a help from abap and write a report and you schedule the report in particular time and once it start it will automatically stop the relevant jobs.....

      But we have lot of option that if can do, that we need to stop the job if it crosses some specific time like that.

      The above one is a option which is present in background job but it not applicable for your case.

      Let me know if you have any queries. Hope you understand.