Skip to Content
author's profile photo Former Member
Former Member

Default work schedule based on action type

Hi,


I want to default workschedule in IT7 based on action type. I didn't want to change structure of feature SCHKZ or writing abap code in user exit.

Any thoughts are appreciated.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Aug 02, 2012 at 03:58 AM

    You neither need to change the structure or write an exit, this can be easily handled by writing a program to return the default value of the WSR in the feature.


    test_01.jpg (27.5 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Aug 02, 2012 at 07:18 AM

    Hi Kris,

    Try defaulting the work schdule rule in IT7 based on action type through dynamic action. Hope below can be of some help.

    * ***DEFAULT WORK SCHEDULE***

    P PSPAR-TCLAS='A'

    P PSPAR-MASSN='01'

    I INS,0007,,,(P0000-BEGDA),(P0000-ENDDA)

    W P0007-SCHKZ='20-WK'

    * ***DEFAULT WORK SCHEDULE***

    Thanks.

    Sairam Maharaj

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.