cancel
Showing results for 
Search instead for 
Did you mean: 

GR Flag on DOC Change BADI

Former Member
0 Kudos

In SRM 5.0 it was not possible to influence the GR flag on the PO in the Doc Change BADI.  In SRM 7.01 is it possible to change the GR flag via a BADI?  Example Vendor is set for GR, but for catalog buys we don't want to receive for the Vendor.  In this instance we want to change the flag based on the type of requirement.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

You can use this BBP_DOC_CHANGE_BADI with the method BBP_PO_CHANGE to change the data in PO items as well in header.

/Manoj

Former Member
0 Kudos

Yes I understand that, however that particular field in the past could not be manipulated in that BADI, has that changed?

Former Member
0 Kudos

Hi Gregory,

Yes it is possible, If you use structure BBPS_BADI_PO_ITEM_1 in SRM under DOC_CHANGE_BADI there is field call GR_IND with component type WEPOS.

Hope this helps.

Thank you

Ritesh