GR Flag on DOC Change BADI

In SRM 5.0 it was not possible to influence the GR flag on the PO in the Doc Change BADI. In SRM 7.01 is it possible to change the GR flag via a BADI? Example Vendor is set for GR, but for catalog buys we don't want to receive for the Vendor. In this instance we want to change the flag based on the type of requirement.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Aug 01, 2012 at 03:08 PM

    Hi,

    You can use this BBP_DOC_CHANGE_BADI with the method BBP_PO_CHANGE to change the data in PO items as well in header.

    /Manoj

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.