There is a requirement as follows,

Multiple products are manufactured at the same resource. So all the orders are scheduled on the resource which runs 8 hrs a day. We need to do maintenance activity order after every 75 hours of run time which is 9+ days. system should show the order which is at 75th hour. so after that order we can do the maintenance activity done which is manual. Actually the resource should take a load of 75 hrs then manual maintenance activity. But the order will be scheduled in a sequence continuously. is there any way to do it?

Regards

Shruths

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Aug 01, 2012 at 10:14 AM

    Hello Shruthi,

    Identifying the maintenance after 75th hour can be achieved using plant maintenance option.

    And you can also block the usage of the resource manually once the 75th hour reached and you can change the resource for the orders which were supposed to get executed at this hour.

    But this will be more of PM and PP integration and needs manually intervention.

    Regards,

    Sharat

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 01, 2012 at 12:21 PM

    Hi

    As your is related to Maimtenance activity.

    You can use IK01- create measuring point for each produced one and it will cumulate.

    Then you can plan your maitenance activity

    Regards,

    srihari.M

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.