Skip to Content
0
Former Member
Jul 31, 2012 at 03:01 PM

Float time (in workdays) for cycle counting

949 Views

sap help says about float time in cycle count

details from sap help :A physical inventory has been planned for a material belonging to category C for June, 1. On expiration of the float time (after June, 6), the physical inventory has not yet been carried out. Irrespective of the category, the material is parked for the next cycle counting run.

Does this means if run the cycle count tcode batch input then system is not going to generate any PI document for this material . suppose if i run the tcode on 10 june then is system going to generate the document or not.

tcode for Cycle count MICN.