Add task detail to DP80 quotation

Hi

We have created a service order (IW31) with all the details on the task lists. Some of the tasks have the same activity type as the hourly cost + rate is identical. When we create a quotation via DP80, these lines are grouped together. How can we show this information in DP80 and in the quotation? Is there a standard solution for this? If not, then we are thinking of adding them as text line but we don't know how.

Kind Regards

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jul 31, 2012 at 09:22 AM

    Hi Jimmy,

    If your Tasks has same activity types, via RRB system is going to convert all those tasks and

    add it as one Material.

    You can try below options:

    • If Number of Tasks are not too many then you can think about creating separate Activity Type.
    • And define separate Material Codes for the same.

    Second option is to create separate Material Code and add the same in Quotation directly.

    Just check the Item category TATX which can be used as Text Item is being determined.

    Regards,

    Mahendra Jani.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.