Skip to Content
author's profile photo Former Member
Former Member

No controlling type could be determined for service contract

Hi,

I am getting the error

  • No controlling type could be determined

I could not find controlling type in img, there is no settings for service processes, am i looking at the wrong place? also in the search i dont find any controlling type, there is only setup time sheet and controlling integration in service transaction. When i execute this, i am getting a system error.

Regards,

Manas.

c.png (19.8 kB)
c2.png (6.5 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jul 30, 2012 at 08:55 AM

    Hi,

    You need to do the controlling settings in ECC system for the contract transaction type.

    Follow the below path:

    Once you have done this, do the controlling settings in ECC system at the path shown below.

    Regards,

    PP


    Controlling.JPG (39.7 kB)
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.