Skip to Content
author's profile photo Former Member
Former Member

Budgetary Control System in SAP

HI,

We have implemented Budgetary Control System in SAP.

There is a requirement that system should give warning for some selected Commitments, for others it should be error if it is over 100%.

Can any body provide solution on this.

Thanks in Advance.

Pravin Joshi

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Posted on Jul 29, 2012 at 05:46 PM

    Hi,

    There is 'allowed exceed budget' on the item level of a commitment (I believe, you speak of EMF of type 'commitment'). If this flag is not set, then no budget over-consumption would be allowed. Otherwise, if the flag is set, you would be able to consume more than 100%, but no warning message would be issued in standard.

    Regards,

    Eli

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.