Skip to Content
0

Basic date in produciton order is changing when get released

Jan 02, 2017 at 10:26 AM

116

avatar image
Former Member

Team,

We are facing some difficulties in production order releasing, when releasing the PO, the basic end date is getting changed, may i know why is it happening?

EG: basis start date is 13.01.2017 when i released the PO , it automatically moved to 02.01.2017..

thanks to hep

10 |10000 characters needed characters left characters exceeded
Former Member

Hi Venkat,

Below the details in OPU3, let me know what settings should i dot to control the default changes in PO date

0
* Please Login or Register to Answer, Follow or Comment.

2 Answers

avatar image
Former Member Jan 02, 2017 at 10:57 AM
0

Dear Vijesh,

Due to automatic scheduling while releasing the Production order dates getting change.
please check the configuration settings of " Specify scheduling parameters"

ADJUST SCHEDULING & SCHEDULING CONTROL FOR DETAILED SCHEDULING.

Best Regards

Venkat

Show 1 Share
10 |10000 characters needed characters left characters exceeded
Former Member

Hi Venkat,

Is it possible to provide me the T-code or path to configure the above settings?

Thanks,

Vijesh

0
avatar image
Former Member Jan 03, 2017 at 10:29 AM
0

Hi Vijesh,

T-Code is OPU3 for production order.

Path of SPRO=>PRODUCTION=>Shop floor Control=>Operations=>Scheduling=> Define scheduling parameters for Production order

Best Regards

Venkat

Show 2 Share
10 |10000 characters needed characters left characters exceeded
Former Member

Hi Venkat,

Below the screen shot of OPU3, please let me know what changes should i do here

0
Former Member

Hi Venkat,

Please advise

Thanks,

Vijesh

0