Skip to Content
author's profile photo Former Member
Former Member

Break schedule error.

Hello All,

Need help on the below issue. When im trying to create a work break schedule, I encounter an error message "Set breaks using time interval or hours" . The situation is i am trying to create a break schedule starting at 10 to 10:45 and i get the specified error when i try to enter 4;00 in the "After" column. Help is greatly appreciated.

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    Posted on Jul 26, 2012 at 04:11 AM

    Hi,

    The start of planned working time is 8 a.m. for the daily work schedule

    DWS1. Employees can take a break after 4 hours, i.e. at 12 a.m.

    You are using Dynamic Break schedule this is how we use After Column

    Means after 4 hours he can type 1 Paid hour of break .

    Regards,

    Raja Sekhar


    DB.png (1.3 kB)
    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Rajasekhar Reddy

      Thank you Raja shekhar and Vivek. I get the point now and have made required changes. Thanks for the help and inputs.

      The solution was 2 different breaks cannot be assigned in the same row. I had to create 2 different rows with number 01 and 02 and separated the issue.

      Points awarded. Thanks.

  • author's profile photo Former Member
    Former Member
    Posted on Jul 26, 2012 at 04:32 AM

    Hi,

    The error that you are getting is due to the break combinations. You are giving two different kinds of breaks as one single entry.

    If your break schedule starts at 10:00 am and ends at 10:45 am, the configuration would be:

    If your break is a dynamic break 45min for every 4hrs from start time it would be:

    You can give the both the breaks with the sequence no. as 01 and 02, which would fulfill your requirement.

    Regards,

    Vivek


    7.jpg (16.4 kB)
    8.jpg (12.9 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jul 26, 2012 at 04:06 AM

    Hi

    You can see a below sample break work schedule,30 or0.50 min is a paid break..and you can keep your start time 10 and end time 10.45 and at paid you can say 0.75 hrs

    Are you trying to create variable break with a range of 10 as a start date and 4 as a End date?

    Once you create the above break the same will be linked to DWS.

    Hope this will help

    Best Regards

    Venkata Manikanth


    timeagain.png (5.1 kB)
    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.