Hi all,

In a normal change the system creates transport of copies after I finish all the development.

What is the best way to import these transport of copies to the QA system?

Can that action be done by the solman? or should I use the STMS transaction?

Of course I want to import just the transport of copy that is relate to the normal change and not anything else.

Thanks for you replay's.

Lior Grinberg

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    Posted on Jul 25, 2012 at 05:43 AM

    Hi,

    You can use either ways to transport changes to QAS.

    Create a New Transport Request using CHARM and copy objects in TOC to the new TR manually in DEV system and then transport as usual using CHARM.

    TOC and TR is not having any difference from system perspective.

    Regards,

    Jayadeep

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Lior

      You can't import a single TOC or a request using charm into any system whethere test or production for normal corrections

      it is designed project based import method so only project can be imported if you have to move a change to QAS earlier then convert this NC into UC means

      Cancel the Change document

      Again approve the CR as Urgent correction......new change document will be created

      use this change document to import to QA

      This is the major difference bet urgent and normal that NC follows Maintenance Cycle phase or project phases but UC don't.

      Hope it helps

      Regards

      Prakhar

  • author's profile photo Former Member
    Former Member
    Posted on Jul 24, 2012 at 01:10 PM

    Hello,

    You can use SCMA tcode to import ToC to QAS:

    Please watch https://websmp104.sap-ag.de/~sapidb/011000358700000478072011E/index.htm

    BR,

    SAPFan

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi,

      Thanks for your replay.

      The problem with the movie clip you recommended is in that method all the transports that belongs to the project will import into the QAS and not just a single ToC.

      I didn't understand what do you want me to do in tcode SCMA how exactly by using this transaction I will be able to to transport my one Toc that was created from a single normal change?

      Best regards,

      Lior Grinberg

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.