Dear Gurus,

I have did costing run for a finished product.

manufacturing cost =3167. I have maintained costing lot size = 100 in material master.

but after releasing the price from CK11n , in material master the price = 31.67 for 1 unit price.

plz tell me how to update exact price from costing run to material master.

thx in adv...........

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear mmboy,

In case if any BOM component is maintained in terms of decimal places,say for example

HCL = 0.019 L or say Caustic Soda as 0.024 kg and now assume the price is also very less for such

components and now during the standard cost estimate of the assembly or sub-assemblies where

these materials are used,the system does now shows any value for these line items or components

as the price go below 3 decimal places.So in such cases the costing lot size of these components

can be increased to 100 and accordingly the price can be maintained,so that the system picks these

materials cost in standard cost estimate.

You can check this and revert back.

Regards

Mangalraj.S

Answers (3)

Answers (3)

former_member186193
Active Contributor
0 Kudos

Hi,

Use T. Code: CK24 to update the price.

Check the link below link for more information:

http://help.sap.com/saphelp_46c/helpdata/En/7e/cb88d743a311d189ee0000e81ddfac/content.htm

Regards,

Alok Tiwari

Former Member
0 Kudos

Hi mmboy,

Maintain Price unit also as 100 in material master in accounting1 view.

You will get the same price.

santhosh

sundaresan_velayudam
Active Contributor
0 Kudos

After CK11n run

we need to mark and relase the price in CK24

If you want to see the price for 100 unit in Material master

just enter the Price unit as 100, in Accounting 1 or in costing 2

Former Member
0 Kudos

Dear Sundar,

thx for explaining.

can u explain ,

what is the use of costing lot size ?

why we shud maintain that ?

is that necessary to maintain more than 1 in costing lot size ?