cancel
Showing results for 
Search instead for 
Did you mean: 

How to upload data in PTEX2000 from one sap system to another

Former Member
0 Kudos

Hi All,

We have a requirement where 2 sap systems are out of sync for one employee.

We need to resend data for a specific time period from R/3 system to another SAP system.

Can anyone help me in understanding how can we resend the data from R/3 system to table PTEX2000 in another SAP system.

Thanks in advance for the help.

Regards,

Prabhat

Accepted Solutions (0)

Answers (1)

Answers (1)

Puneet_Gupta
Contributor
0 Kudos

How is the data normally sent between the 2 systems?

- Puneet