Arguments for two or three systems

Hello experts,

  • At the moment we have a three system BW landscape (DEV->QAS->PROD).
  • We do development for reporting in QAS and transport to PROD.
  • We even have just for QAS and PROD a BO Plattform connected, none for DEV.
  • Development of data models and all other customizing is done in DEV and goes ->QAS->PROD.
  • We have two other ERP systems with DEV->QAS->PROD landscape.

So, wouldn't it maybe be better to have just a BW landscape DEV->PROD? What are the arguments pro and con?

Thank you for ideas and experiences!

Best regards,

Peter Baumann

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jul 09, 2012 at 09:20 PM

    why do you think it is better to have two? I would tell you why it is not better...

    1. Dev doesn't need to be as big as QA, only small unit test is being done in dev and regression test is being done in QA.

    2. QA since it is already bigger in size, you can refresh for more latest data from production once in a while. If you have DEV and if you refresh dev from production everything gets messed up.. transport and untransported objects get deleted.

    3. In cases you move objects to QA and you notice something is not right, then you can always reverse back the changes without impacting the Production system. In two landscape scenario, the correction happens only after the fact.

    4. and more and more.

    thanks.

    Wond

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 10, 2012 at 03:06 AM

    Hi,

    Yes as mentioned above Dev is smaller system ,u can have data and development client here..Normally it contains lesser data here..

    Quality is normally replica of prod and it shd be bigger in size,we should be in the position to copy the data from production or in case we extract the data from source say ECC ,it shd be big enough to hold that data..

    usually integration testing and UAT is conducted in quality and for business we never allow any access to dev environment and it shd be non modifiable at any respect..

    also deve environment since many projects are going on it gets unstable because of this and things are volatile every day..so results might differ..I hope I am clear

    Thanks and regards

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.