Error message in pp

former_member357396
Participant
0 Kudos

hi,

      No ord.proposal can be calculated for consumption-based components why it is showing this when i run md04 and in md04 the system is not showing the below materials required for sfg .what may be the reason and how to trouble shoot this .

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Prasad,

Adding on -

Please refer to SAP notes 549752, 192954, 37697.

Regards,

Senthil

former_member186193
Active Contributor
0 Kudos

Hi,

Consumption-based components are not relevant to MRP, therefore no element can be calculated to cover them. There is no direct way for the system to assign planned orders for these components.

Check the link:

http://sapdocs.info/sap/materials-management-2/mrp-vs-consumption-based-planning/

Regards,

Alok Tiwari