on 07-06-2012 11:40 AM
Hi,
I’ve scenario of I’m creating the process order and doing the batch determination in that order. In the order batches is assigned.
Ex: X batch assigned to XXXX material in PO1.
I created the another process order and I did the batch determination and assigned batches to that order.
Ex: X batch assigned to XXXX material in PO2.
X batch having the stock 100.
X-50 assigned to the XXXX for PO1
X-50 assigned to the XXXX for PO2.
I created the PO3 order. When I’m doing the batch determination system is proposing the X batch for XXXX material in PO3.
My issue is already X batch assigned to the PO1 & PO2. For PO3 it should not propose.
What I need to do for this.
Naren
Hi
If you want to batch determination as per orders do batch determination at the time goods issue.
This can be controlled using batch search strategy->strategy type-> ME01 (Movement type/Plant/Mat.No)
Regards,
srihari.M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.