Former Member
Jul 06, 2012 at 10:40 AM

Batch Determination

18 Views

Hi,

I’ve scenario of I’m creating the process order and doing the batch determination in that order. In the order batches is assigned.

Ex: X batch assigned to XXXX material in PO1.

I created the another process order and I did the batch determination and assigned batches to that order.

Ex: X batch assigned to XXXX material in PO2.

X batch having the stock 100.

X-50 assigned to the XXXX for PO1

X-50 assigned to the XXXX for PO2.

I created the PO3 order. When I’m doing the batch determination system is proposing the X batch for XXXX material in PO3.

My issue is already X batch assigned to the PO1 & PO2. For PO3 it should not propose.

What I need to do for this.

Naren