Skip to Content
author's profile photo Former Member
Former Member

CKM3 View options- Cost component

Hi Expert,

When we display T.code: CKM3 (Material Price Ananlysis), you have option to choose view as Cost component (Below to the current valuation option)

For some reason, this option (cost component) is not enabled. But, only, I can see price determination structure & price history views.

I invite your suggestion to view Cost component option in CKM3.

Thanks
Satheesh Vallepu

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jul 06, 2012 at 09:03 AM

    The cost component option is available for materials with "transactional based" price determination.

    Go to MM03/Accounting1 and check what is the control for your material:

    ScreenHunter_01 Jul. 06 11.02.jpg

    Cheers

    J

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Aug 30, 2013 at 12:03 PM

    I had a similar situation. To solve this problem, you should to activate actual cost component split in spro. (IMG - Controlling - Product Cost Controlling - AC/ML - Actual Costing - Activate Actual Cost Component Split. )

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.