cancel
Showing results for 
Search instead for 
Did you mean: 

2LIS_02_SCL missing data

Former Member
0 Kudos

Dear all,

We have a problem of Data mismatch between BW and ECC while loading data from 2LIS_02_SCL :

While running setup for 2LIS_02_SCL with Document date range (2010.01 - 2012.12), we found in some month data is correct but in some other month data is missing.

We compare the data in ECC thru tcode ME23N, and found some PO whose document date falling into our setup range could not be fund in BW PSA. Is ME23N the correct tcode to verify schedule line loading? We also used ME2M and the data mismatch too.

Any ideas on this above issue please post to this thread, your help appreciated ,

Thanks in advance,

BR,

Tim

Accepted Solutions (1)

Accepted Solutions (1)

former_member210724
Contributor
0 Kudos

Hi,

Better check the data in RSA3 or base tables on which 2LIS_02_SCL is i.e.,EKET,EKPO,EKPO..

Anand.

Answers (2)

Answers (2)

Former Member
0 Kudos

Hello,

Take few PO numbers, check the data in the ECC (RSA3) and in BW side PSA.  Also check, PO's missing belongs to a particular month or so.??.. Also, check the Info package whether there are any selections applied there ??

if its for a particular month, then you can fill the set up tables once again and pull the data to PSA. then the job will be easy further..!!

hope this helps

regards,

Hema

ravi_chandra3
Active Contributor
0 Kudos

Hi

Once check whether any routine is there which is filtering the data ,

Regards,
RaviChandra