cancel
Showing results for 
Search instead for 
Did you mean: 

MMPV

Former Member
0 Kudos

Is there a way to advance MMPV rapidly so I don’t have to do one period at a time from 2007 to 2012? Please see the screen shot.

Moderator message: Basic frequently asked question - Please search forum for answers

See as well our rules of engagement

: http://scn.sap.com/docs/DOC-19331    Thread locked

Message was edited by: Jürgen L.

Accepted Solutions (0)

Answers (2)

Answers (2)

tejyadav
Active Contributor
0 Kudos

Refer the link, Basic question http://scn.sap.com/thread/2128232

sushant_wanjari
Contributor
0 Kudos

Hi,

one way to do that would be to un assign the plant from company code and then initialize the company code. Maintain the current posting periods and then assign the plant to company code.

This can be done only if you are in development system.

Regards,

Sushant