Costing Run Issue

Dear Gurus,

I have created a Dummy workcenter. In that i have linked the overhead percentage to costing element.

but while executing costing run, it is showing blank.

I have attached screenshots.

Plz tell me , where the link is missing.

workcenter.JPG (55.7 kB)
CK11N.JPG (92.2 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    Posted on Jul 03, 2012 at 05:20 AM

    Dear mmboy,

    I'm not sure why have you shown the screen shot of the work center and trying to link with the

    overhead cost,during a standard cost estimate.

    If my understanding then during standard cost estimate the system picks the BOM,Routing throught

    the costing variant used in the input screen of CK11N and it sums up the cost to arrive the standard

    cost.

    In addition to this,the system also includes the overhead cost provided if the costing sheet is

    assigned to the costing variant used for cost estimate and also overhead group should be assigned in

    the costing1 view of the material master(apart from the config settings of costing key,overhead

    group).

    Check and revert back.

    Regards

    Mangalraj.S

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Mangalraj Senthamaraikannan

      Dear Mangalraj,

      thx for ur valuable reply .

      I have given overhead group only for the finished group.

      do i need to assign that in raw materials also?

      (i ll close this question after this answer)

      thx in adv............

  • author's profile photo Former Member
    Former Member
    Posted on Jul 03, 2012 at 05:18 AM

    Hi,

    The cost of Product is

    = Component cost+Activity cost+ Overhead cost

    I see the there is component cost in CK11N - Cost of components like RC Pad, PU Foam,Bond Foam etc are considered.

    You have maintained the overhead cost which in % of cost.

    I donot see any Activity cost for activity GLOB in CK11N.

    You need to main the price of Activity GLOB in KP26 for the current month.
    Then you will activity price in your costing run.

    Maintain activity price and run CK11N.


    Regards,
    Srini

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jul 05, 2012 at 08:33 AM

    Dear mmboy,

    You need to assign the overhead group only in the masterial master of semi-finished and finished

    products.

    Regards

    Mangalraj.S

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.