Skip to Content
author's profile photo Former Member
Former Member

UWL / Delta Pull Configuration

Hi,

I am trying to configured delta pull in UWL, but when I create a new SYstem in UWL administration, I get the message:

Could not verify if the backend of system <alies name > is configured for optimized delta pull.

My portal is 7.01 SP6

I am also go through following document.

http://www.google.co.in/url?sa=t&rct=j&q=universal%20worklist%20-%20delta%20pull%20configuration&source=web&cd=1&ved=0CFAQFjAA&url=http%3A%2F%2Fwww.sdn.sap.com%2Firj%2Fscn%2Fgo%2Fportal%2Fprtroot%2Fdocs%2Flibrary%2Fuuid%2F20bc6e3d-4243-2e10-fa96-f3ec59f8b8e4%3FQuickLink%3Dindex%26overridelayout%3Dtrue&ei=iTDtT-eNH4mJrAflrPy9DQ&usg=AFQjCNFCd0V5HtKW1hvrjffy0jxuGRxggw&cad=rja

Thanks and Regards

Deepak Raikwar

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jun 29, 2012 at 05:30 AM
    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 29, 2012 at 07:05 AM

    Hi Deepak,

    Can you check wheather the user running,these jobs should have the following roles:
    SAP_BC_BMT_WFM_UWL_END_USER,
    SAP_BC_UWL_END_USER
    SAP_BC_UWL_SERVICE

    2. Reregister the connector.
    3. Change the Delta Pull Channel Refresh Peroiod (in Seconds) and save.

    check have you applied this note 1133821

    Regards

    shrikant

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 29, 2012 at 09:02 AM

    Hi Deepak,

    There is more information about setting up the delta pull in Note:
    1577545 - Handling Delta Pull Issues - "Could not verify if the backend of system <UWLWebFlowConnectorName> is configured for optimized delta pull"
    This Note also references the help documentation. The jobs can be set up every three minutes as well. It appears that some of the parameters as well are not set correctly on the system. I would recommend if you have a lot of workitems, that you increase the time of the refresh/parameters. You can find more information in relation also to these parameters in this Note and SCN Article:
    Note:
    1577547 - UWL Performance Tips and Considerations
    SCN ARTICLE:
    http://wiki.sdn.sap.com/wiki/display/BPX/Universal+Worklist+Parameter+Co
    nfiguration+for+Optimal+Performance

    Regards

    shrikant

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.