Hi Gurus!
I have a simple question, at least I hope.
In the same controlling area is possible run the Cost Estimate with Quantity Structure and Production Lot Cost Estimate? Can I release Standard cost estimate for a material and same time active a production lot costing with two different Costing variants?
Thanks
Nik