Hello everyone.

I have maintain ABC material as bulk material and also tick on blackflushing in material master , but ABC material is not maintain any bom. then how to system blckflush the material ? and how much quantity ?

Plz explain .

Thanx

Sushant

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    Posted on Jun 13, 2012 at 01:15 PM

    Hi,

    First of all if you have not maintained any material in BOM it will not come for backflushing during goods movement while confirmation.

    You can include these in Bill of materials but these materials will not be taken into account for product costing. Goods issue of bulk material is done to cost center when these material are consumed.

    Regards,

    Alok Tiwari

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jun 13, 2012 at 11:32 AM

    Dear Jadhav,

    Bulk materials are generally issued against a cost center using 201 movement and not through 261

    movement.

    Even if you set the backflush indicator,I doubt whether this particular item will be shown in the

    reservation list of an order assuming this material is assigned as one of the BOM item.

    If it's not assigned to any of the BOM as a BOM item,then no reservations will be generated and no

    postings will happen.

    But can you tell us your exact query?

    Regards

    Mangalraj.S

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jun 13, 2012 at 01:25 PM

    Hi

    When you have not assigned the material to Bill of material, it means you are not using this in production orders. Then there is no meaning of maintaining that material with backflush indicator.

    Bulk materials are something like thinner, oil etc ( based on business) which you want to do issue to cost center and for which you do nit want cost roll up in order.

    Backflush you can use somewhere you want the goods issue happen for the materials inside the order while doing production order confirmation.

    Check why you want to tick both indicators.

    Regards,

    Sharat

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jun 13, 2012 at 04:49 PM

    Bulk indicator takes priority over Backflush indicator. So the component won't even get copied (exploded) to production order

    It will get copied (exploded) only if you make the relevant settings to in OPPR and/or OPPQ. But still you cannot issue it against the order.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.