I'll like to ask if it is possible to change the project stock setting in the control tab of a WBS element if it's set to valuated stock?

It's because of some G/L account issue, my company users wished to change it from valuated stock to non-valuated stock, but they are unable to do so as the option is greyed out.

Is it possible that some document has been opened using this WBS element therefore the option is locked?

Or once the WBS element is set to valuated project stock it cannot be changed?

Thank you very much and hope to get your advise.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jun 11, 2012 at 01:16 PM

    Hi,

    I believe these are project level settings and not at individual WBS. At the time of Project creation system allows you to choose option between valuated and non valuated but once you save your Project, you will not be allowed to change the options.

    Regards,

    Pramod

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.