Former Member

APO PDS alternative modes used together

Hello,

I have the following scenario:

Workcenter A => produces Material X => 1 pc / hour

Workcenter B => produces material X => 2 pc / hour

When I create an production order of 150 pc, I want that the APO uses both resources A and B (at same time) to produce the material X, resulting:

Workcenter A => occupied 100 h => 100 pc

Workcenter B => occupied 100 h => 50 pc

If I create an activitie with 2 modes, the system will select ONLY one to produce the order? Even in optimizer ?

Thanks!

Best regards,

Mengue

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • avatar image
    Former Member
    Jun 11, 2012 at 01:23 AM

    Hi Mengue,

    You can set 2 operations with parallel sequence in the routing.

    Claire

    Add comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Claire,

      Thanks for the answer.

      But I think that will not work, because I need to use the workcenters in the same operation (alternative wotkcenters) at same time.

      Best regards,

      Mengue

  • Jun 11, 2012 at 02:50 PM

    Hi Leandro,

                       APO PDS alternative modes will not work for your requirement. You may want to explore pooled capacity. Create pooled capacity for combined work center("A+B) and assign the pooled capacity to one work center and use this work ceneter in routing.

    Hope this helps.

    Thanks

    Dev

    Add comment