cancel
Showing results for 
Search instead for 
Did you mean: 

DMR Rule

lakshmi_prasad7
Contributor
0 Kudos

I create  DMR Lot create level  in this  rule i defined stage one

above DMR rule I defined, now i am facing one issue while doing GR  First & Second Lot Status is showing "REL  SKIP SPRQ QLCH" and Third  GR Lot "REL  CALC SPRQ QLCH" showing this it means i can enter results  third inspection lot only but my requirement is  First lot should be allow  inspection results  next two inspection lots  Skip how we will achieve this business requirement

if any body know kindly guide me

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member42743
Active Contributor
0 Kudos

Check your DMR.  In the DMR screen you can select either "at lot creation" or "For usage decision"

I think you might have this set to "at lot creation".. Pick "For usage decision" instead.

FF

lakshmi_prasad7
Contributor
0 Kudos

Thanks for your rapid reply but  if i change  dynamic modification  for Usage Decision Instead of Lot creation i got  inspection lot as a "REL  SKIP SPRQ QLCH" kindly guide me

former_member42743
Active Contributor
0 Kudos

Before testing the change, had you reset the quality level back to the initial?

FF