ERP Stack and NW Stack

Hi gurus,

Can anyone tell me the difference between ERP stack and NW stack? Is ERP stack is for Application and NW stack is for BASIS/ABAP? We are tying to apply HRSP in our ERP 604 / NW701 system. In the past when we had 470 enterprise system, we only had to apply BASIS/ABAP when we applied HRSP. But now, Accoring to note 1425556, it looks like new ERP system requires both ERP and NW Stacks. I just want to verify if ERP stack is refers to application support packs. We do not want to apply application support packs when apply HRSP. Can anyone tell me what's the requirement to apply HRSP? For our case, we would like to apply HRSP up to 48. Our current system is ERP 604 SP5 / NW7.01 SP5. Thanks.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Best Answer
    Posted on Jun 06, 2012 at 03:57 AM

    Hi Michael,

    For ERP stack , the SP level is mainly depends on eg: SAP_APPL where NW stack is depends on SAP_BASIS.

    However, there are some dependancies on HRSP with others application stack. Best way to generate and calculate the stack is via MOPZ.

    Cheers,

    Nicholas Chang

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 06, 2012 at 08:10 AM

    Correct.

    Add the system in Solution Manager and calculate the stack through MOPZ. That will give the correct details of all the support packages to be applied.

    Thanks,

    Ravi

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 06, 2012 at 09:36 AM

    Hello Michael,

    The main component that determines an ERP system is SAP_APPL or SAP_HR and the main component that determines a Netweaver system is SAP_BASIS.

    In R/3 4.7 systems you could update only the HRSP (with its prerequisites)
    But from EHP4 onwards it is always recommended to update the entire stack
    (ERP and NW) as a whole. This will take care of any dependent component or a prerequisite.
    Please use Solman and generate the stack via MOPZ for the same.
    As you wish to update to HRSP 48, please select the "Maintainence" option in MOPZ and
    select up to stack 9 to do the update. You can do the stack update using SAPehpi.

    As per note: 1425556,

    EnhP4 Required Required
    SAP_HR EA-HR Available EnhP4 STACK NW STACK 7.01

    48 48 10.05.12 9 (03/2011) 8(12/10)

    I hope this information helps.

    Regards,

    Sandhya

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.