Skip to Content
author's profile photo Former Member
Former Member

Automatic creation of shipment cost

I have create new table for access sequence MATK- Vendor/ Shipment Route with field conditions LIFNR/ ROUTE and assign the access sequence with the condition type FB00. Then i create a new Routes and Stage like 00005 in route stage i define Dep. Point kolkata and in Dest. Point i define chennai, then in TK12 i define the price with the route 00005 with the transporter. Still the system is not picking the price i have maintain in TK12 when i am doing VI01. Please help me on this.

Regards

Abhisekh Mandal

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jun 05, 2012 at 05:57 AM

    Hi,

    Did you check the status of the shipment document.

    Calculated- C

    Assigned- C

    Transferred- A

    Check the following settings in IMG - Transaportation - Shipment Costs

    Shipment Cost Relevance and Default for Shipment Cost Type

    Check for your Shipment type which level you have ticked for Shipment cost calculation.

    If you are calculating the cost @ the header level, then you have to change it to Leg level.

    Also check your shipment cost types & item categories (whether you have specified the relevant assignment for the shipment cost type & item categories settings)

    Assign the above settings & check.

    regards,

    Nags

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jun 05, 2012 at 06:53 AM

    Check in Analysis tab as to why system is not picking the price. Update here the message what system shows.

    G. Lakshmipathi

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 05, 2012 at 07:26 AM

    Hi Abhisekh Mandal,

    Can you be still moer clear on your problem as i understand from your discussion that their might be problem with route stages / route. As suggested by Lakshmipathi can you put the analysis screen shot.

    Regards,

    Sreekanth

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      In Routes

      Route 000005, description ABC trans, Mode of Tr- Border 3, Shipping type-01, Shtypeprellleg-01, shtypesubleg- 01

      In Route Stage

      Route 000005

      Itinerary 1

      Location Dep. Point 1000, Dest point 1101

      In transportation Connection point 1000, 1101

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.