No routing could be determined for material xxxx

Former Member
0 Kudos

Hi All

I'm trying to run Transaktion CK11N and everything works fine so far.

The only one Problem I can't figure out is the warnining message

"No routing could be determined for material xxxxx" Message no. CK229.

The funny thing  is the Routing of this material is there, it is aktiv, the date validity is OK,  the status is OK so !?

I'm getting crazy because I can't find anything related to this message,  why the CK11N keeps telling me no routing is there??

Do you have any idea what could be the reason of it or may I forget something to check into?

Any help will be highly appreciated.

Best Regards

Gaspare  

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear Gaspare,

Check these parameters,

1.Check the validity date,lot size,usage(1- Production) and status(4 - Released General) of the

particular material's routing.

2.Ensure you have created the proper task list type for the material(like routing/rate routing/master

recipe etc).Check this by double clicking the proper costing variant in OKKN(the one used in

CK11N)--->Qty Structure Control--->Routing ID(check the priority,type for this ID).

3.In case if you have set the value as 2 in BOM selection method in MRP4 view,ensure proper

production version is created for the said validity dates.

Regards

Mangalraj.S

Former Member
0 Kudos

Hi All

Many Many thanks for the very fast replies!

Yes, the problem was the worng Lot size triggered automatically

by CK11N comparted to the routing of the material.

Thanks again to all of you.

Best Regards

Gaspare

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Check the routing master whether it is reated costing or not ...... And try to select the qty str manually while you are doing ck11n see wheteher exploding qty str or not...

Regards,

ram

neeraj_bhardwaj4
Contributor
0 Kudos

Hi

Kindly check the quantity structure in Costing variant and what parameters have been configured for routing..

Neeraj