summarized JIT call with ASN confirmation

Hi All,

I am using summarized JIT call. In scheduling agreement I have assigned confirmation control key and created the ASN.

Now while doing goods receipt against JIT call through PJWE, system is giving error message GR posting must be done with reference to confirmation.

Please guide how to proceed.

Sangram

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jan 07, 2014 at 04:05 PM

    Sangram,

    Did you get the JIT call receipt with ASN process functioning? We are looking at a similar process.

    Thanks in advance for your response.

    Bob

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 07, 2014 at 04:20 PM

    Hi Sangram

    Have a look at the following SAP note with a correction instruction

    1566455 - PJWE: Flag T163G-WEREL is not taken into account

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.