Skip to Content
avatar image
Former Member

Managed systems

Dear all,

I configured solman as a central system on a single host and the sld is configured locally on the same host.

Steps system preparation and basic configuration are ok.

Now I want to connect a managed system in solman.

When I go in Managed Systems Configuration, ABAP  and Java Servers are automatically set, but with red signals.

There is also a dual stack in the technical scenario (also red)

What system should I choose between technical systems and dual stack ?

I think signal must be green and not red but i don't understand should i connect the two technical system ? Because this two systems are my solman solution.

I have  connect the BO system through system operations -> create system

1.jpg (15.0 kB)
2.jpg (11.2 kB)
Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    May 30, 2012 at 09:07 AM

    Did u completed it with RZ70?

    Add comment
    10|10000 characters needed characters exceeded