Skip to Content
0

Sequence for running Control Sets

Dec 29, 2016 at 10:30 AM

36

avatar image

Hi All,

We are on BPC 10.1 NW and are performing Legal Consolidation. We have 3 Control Sets that we want to run at different times during the month end close process.

1. Preliminary Controls

2. Pre-Consolidation Controls

3. Post Consolidation Controls

Is there a way to sequence these control sets for the same period?

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

0 Answers