Dear All,
1) Our client want to release all PR's in ME55 tcode in one click, without clicking each line item.
Is it possbile in ME55 as we do in ME54N by selecting all line items and clicking release flag?
2) How to change existing Item level PR release strategy to Header level?
If its Header level,where Release strategy tab appears (as we see in PO)?
Please advice
Regards
Hi Venkat,
It is possible to release PR at header level. The indicator should be set for the PR document type and Release group as "Overall Release". (Page 7)
http://www.scribd.com/doc/58455010/PR-Release-Strategy
Please confirm with client before making changes because header level release will be applicable for plants mentioned in Purchase requisition.
Some of the buyer makes purchase requisition with more then one plant.
Thanks
Abhi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
1) Our client want to release all PR's in ME55 tcode in one click, without clicking each line item.
Is it possbile in ME55 as we do in ME54N by selecting all line items and clicking release flag?
It will be possible based on Release code & not for multiple Release Code
2) How to change existing Item level PR release strategy to Header level?
If its Header level,where Release strategy tab appears (as we see in PO)?
Check below encircled for Header release placing
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.