I have two condition types. Only the condition type A has a access sequence assigned. In the pricing procedure, the condition type A has only the Reqt 2 assigned. C.t. B has a requirement and a calculation type assigned.

What i want: for a certain scenario the condition type A should be calculated as condition type B is calculated and to ignore the condition records found. Is it possible? How can i do that? It's enough if i create a requirement for A as a copy from B and assign it?

A is upper in the pricing procedure than B.

Thanks

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Better to create a new requirement for Cond type A that if it meets your particular scenario, it should calculate as per the AltCalc type (assign the same AltCalc type of Cond type B to Cond type A).If not, then  it should behave as per the Requirement 002.

was_wasssu
Participant
0 Kudos

And if exists record conditions? will be ignored? or a have to do something to ignore it?

Former Member
0 Kudos

For Cond type A :

1. Create a new requirement with logic combining ( reqt of Cond type B + standard reqt 2 ) so that if any of these situations this Cond type A will be executed.

2. Create a AltCalc type by copying the same of Cond type B and modify in such If it meets the particular scenario it should calculate as per AltCalc type of Cond type B and if not it should read the condition records of Cond type A.

was_wasssu
Participant
0 Kudos

How can i "tell" to read the condition records or to calculate in my way?

Thanks

Former Member
0 Kudos

Provide the func spec to ABAPer with logic and relevant table names. He will create the new routines and later you can assign it in your pric proc.

Former Member
0 Kudos

Wassu,

Can you please give us more info? What kind of condition are these? Price, Surcharge,Discount?

Vic

was_wasssu
Participant
0 Kudos

Price.

Thanks

former_member211616
Active Contributor
0 Kudos

Hi Bodiwala,

While doing doing copy condition type in the master data tab there is a option called reference document there u  have to maintain which contion type copying

Hope it will help u out

Regards