Good Evening PS Gurus,

User is adding material to project builder & changing the Storage location (A) in the project & choose reservation for WBS. Upon MRP run in MD04 for that material storage location is wrong (B) (meaning it’s not the same storage location (A) which was entered in project builder, but it’s coming from Storage loc. for EP  (B) under procurement in MRP 2 tab under material master)

Is there any way we can bring the same Storage location (A) as in CJ20N after MRP run in MD04 screen.

Kindly do me the needful.

Thanks & Regards

MM

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Check table T001L - storage locations against plant assignment. Usually storage location defaults from material master data. Let me know did you get any error message while maitaining SL A in project builder?. In fact system should give an error message if SL A is not maintained against plant.

check with MM forum.

Regards,

Sudhakar