Hi Gurus!!!
I would lik to know there is a solution for scenarios below:
I need to plan capacity, but the finished and semi-finished are material with variant configuration. How I can plan the capacity with this scenarios.
Ex.:
- Semi-Finished code = 100000 (Car model A)
- Stock = 3 with batch number = A1, B1 and C1.
- This 3 batch have different characteristics:
A1 = Car with leather seat
Car with sport tires
Car with red color
B1 = Car with standard seat
Car with standard tires
Car with white color
C1 = Car with standard seat
Car with standard tires
Car with red color
- Finished code = 600000 (Car model A)
Then sales departament create a sales order with this configuration:
- Car model A code 600000 with leather seat, standard tires and blue color.
Labors hour spend to produce the car depends the semi-finished I choose. If I choose batch number A1 I need change tires and color than spend a "x" hours, if I choose B1 I need to change the seat and color so the hour I need is different when I choose A1.
Regards,